top of page

Production Plant Plan

The brief: iDeas Design were approached by BUFA, who produce and blend a range of chemicals, paints and resins. They required a set of P&ID drawings of the facility as well as a 3D model and drawings for their H&S documentation and also for servicing and maintenance. This included all chemical pipework, equipment, platforms, extraction and compressed air lines. 

Service provided: Design and drafting services

Length of project: 3 Months

bufa site
bufa site b
bufa site c
bottom of page