iDeas Design have recently completed the design and helped with overseeing an installation of a new water treatment plant at a major plastics recycling centre in the north of England.
iDeas Design were involved with designing the structural steel platform, the plant layout and piping and also compiling the technical manuals as well as UKCA marking the system.
One of the major hurdles was the system had to fit within a 9m x 9m containment bund so space was at a premium. The plant will be commisioned later this year.
The new water treatment plant
Comments